The last sections of the tubbing have now been laid and this entry is being written with the background din of the vacuum pump from the garage. A photo of the initial layer of CF and foam is below. The carbon is covered by a layer of peel ply, followed by a layer of breather blanket which allows air to flow, and absorbs excess resin. A mylar bag covers everything, and the yellow tacky tape forms the air tight seal. The hose at the top of the frame leads to a vacuum pump, which happily ticks away until the resin goes off.
Wednesday, August 26, 2009
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment